|
Alderwood Centre
Sir Adam Beck Multi-Use Centre
Etobicoke, Toronto, Ontario
This multi-faceted project was built with the following
materials: Bernardi Pre-Cast Stone:
Feature stones in arch wall
Lines at base of building
Feature stones in mason walls
Day & Campbell Autoclave Block supplied the block products for the entire project.
Shaw Brick from Nova Scotia supplied the brick products
which were distributed by Brampton Brick of Brampton, Ontario for the entire
project. |